Slide 5 of 17
Notes:
This is an attempt at cost estimation done in a study at the Institute, in conjunction with Miami of Ohio.
It was done in 93 - representing a transfer line operation
The tooling costs were estimated by determining, for each station, the frequency of tool replacement through a 24 hr. period